Case study · Telecom & Data Centers Sample

Fiber and network turn-up for a new data center region

Fiber technicians and network deployment engineers installed, certified and turned up the network backbone for a new region.

100%links certified before handover
Same daylayer 1 fault resolution
Aheadof server arrival

The challenge

A network vendor had a tight window to install and certify thousands of fiber links and bring spine-leaf fabrics online before servers arrived.

Our solution

  • Deployed certified fiber technicians for trunk installation, splicing and MPO terminations.
  • Tested and certified every link with OTDR and Fluke testers, with results delivered daily.
  • Network deployment engineers staged, configured and turned up switches using automation templates.
  • Worked hand in hand with cabling crews to clear layer 1 faults the same day.

The results

  • 100% links certified before handover
  • Same day layer 1 fault resolution
  • Ahead of server arrival