The challenge
A network vendor had a tight window to install and certify thousands of fiber links and bring spine-leaf fabrics online before servers arrived.
Our solution
- Deployed certified fiber technicians for trunk installation, splicing and MPO terminations.
- Tested and certified every link with OTDR and Fluke testers, with results delivered daily.
- Network deployment engineers staged, configured and turned up switches using automation templates.
- Worked hand in hand with cabling crews to clear layer 1 faults the same day.
The results
- 100% links certified before handover
- Same day layer 1 fault resolution
- Ahead of server arrival